Announcement

Collapse
No announcement yet.

New Year Maintenance Project

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • New Year Maintenance Project

    Spent a part of my New Year break giving the viffer a present.

    rebuilt the rear brake - following on from recent posts about brake drag and lubrication (thanks all)

    gave her a guts full of Motul 5100 10W50

    a new Michie Pilot Road 2 on the front to match the rear (from Tyres for Bikes). Was a bit so so with the new tyre at first, but I found that when fitted they only put 30 psi in it. With proper pressures (36 front, 42 rear) these tyres are friggin awesome!

  • #2
    I found that mirror mount if you still want it too, but it's for the left side, so might look a touch odd.

    Pull the old one off and sand it back, and take to it with a can of gloss black paint.

    Comment


    • #3
      Originally posted by Jonchilds View Post
      I found that mirror mount if you still want it too, but it's for the left side, so might look a touch odd.

      Pull the old one off and sand it back, and take to it with a can of gloss black paint.
      Thanks Jon. I checked to see if the mounts might be interchangeable, but no go

      Looks like a reno job

      Comment

      Working...
      X